服务热线
0512-36900456
Wastewater disposal Lamella clarifier- inclined tube sedimentation tank

Wastewater disposal Lamella clarifier- inclined tube sedimentation tank

Inclined tube sedimentation tank is a high-efficiency combined sedimentation tank designed by our company based on shallow pool sedimentation theory. The principle is that a plurality

of dense inclined pipes or inclined plates are arranged in the settlement area, so that suspended impurities in the water are deposited in the inclined plate or the inclined pipe, the water

rises along the inclined plate or the inclined pipe, and the separated sludge is along the gravity effect. The sloping plate (tube) slides down to the bottom of the pool and is then

discharged. The device can improve the deposition power by 50% to 60%, and can be improved by 3 to 5 times in the same area. The inclined tube sedimentation tank is suitable for

the treatment of industrial sewage such as electroplating, coal mining, printing and dyeing, tanning, food, and chemical industry.

Design Principles

The inclined tube sedimentation tank can plan different flow rates according to the experimental data of the original wastewater, and the coagulant is generally added when used. The

flocculant is added to the deposition zone at the same time as the raw water after the inlet valve, and enters the filtration zone through the inclined pipe, and enters the system through

the outlet valve in the clear water zone. During the back flushing, the clean water in the clear water area is discharged into the sewage system through the filter zone and the

sedimentation zone, and the cleaning of the filter material, the inclined pipe and the sludge discharge are completed. The dosing of the flocculant and the setting of the inclined tube

deposition zone deal with the problem that the circulating water has a low filtration power due to the effect of the dispersant.

 

Features:

 

1. Utilizing the laminar flow principle, the processing ability of the sedimentation pool is improved;

2. Shorten the particle settling interval and then shorten the deposition time;

3. Increased deposition area of the deposition tank and then improved processing power.

Our service:

Before sale.

(1)A year after a problem we can solve it at any time.

(2)If you need a replacement, we'll sell it to you at the cost price.

(3)There is any doubt about the equipment in the future, and you can contact us at any time

After  sale.

(1)A year after a problem we can solve it at any time.

(2)If you need a replacement, we'll sell it to you at the cost price.

(3)There is any doubt about the equipment in the future, and you can contact us at any time

 

FAQ:

(1)Are you factory or trading company? 

We are factory.

(2) What is your terms of payment?

T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.Or L/C.

(3) Do you test all your goods before delivery?How to install after the equipments arriving destination?

Yes, we have 100% test before delivery.We will provide detailed illustrations to you. If it is necessary,we will send technicians to help you.However,the visa fee,air tickets,accommodation,wages will be paid by buyers.Or you can ask your technicians to our factory,we will train him.

(4)Where is your factory located?How can I visited?

Our factory is located in Shandong Province,China.It is about 2 hours from Qingdao airport.We can pick you up if you need.Welcome to visit our factory.

(5)How long is your delivery time?

Our delivery time is true after the order is completed.

 

How to order:

(1)A detail inquiry to our Mail box.

(2)We can provied a technical guidance solution.

(3)We do the product after we receive 30% of the advance payment.During this period you can come and check.After the remaining tail payment is received, we will order the shipping.

 

 

Contact Us
Contact: Mobile: Address:
Ms Liu
Copyright © 2024 Shandong Jixu Environmental Engineering Co., Ltd.
All rights reserved.
Cloud computing support Feedback Manage