服务热线
0512-36900456
Package / Integrated underground sewage water treatment plant WWTP / ETP

Package / Integrated underground sewage water treatment plant WWTP / ETP 

 

Advantage: 

▲The effluent water quality is good: the advanced membrane bioreactor technology is adopted, which makes the effluent water quality of the system superior to the traditional

sewage treatment equipment in all aspects. The effluent water quality is close to the tap water in the sense, and can be reused as water. 

▲ Occupied area is small: due to the efficient separation of membranes, it is not necessary to set up solid-liquid separation equipment such as sedimentation and filtration, no

need for backwashing, and the concentration of suspended solids in the effluent is much lower than that of traditional solid-liquid separation equipment, making the whole

system simple and easy. Integration, system footprint is greatly reduced. 

▲Save operating costs: Membrane bioreactor can filter out harmful substances such as bacteria and viruses, which can reduce the disinfection device and daily dosage, making

management and operation more convenient. 

▲The system has strong impact resistance and wide adaptability: it prevents the loss of various microbial flora, and is conducive to the growth of slow-growing bacteria

(nitrifying bacteria, etc.), making the residence time of some macromolecules difficult to degrade organic matter longer, which is beneficial to Their decomposition, so that the

various metabolic processes in the system go smoothly. 

▲High degree of automation: WSZ-AO has greatly shortened the process flow due to the use of membrane technology. Through advanced control technology, the equipment is

highly integrated and intelligent, and it is one of the domestically-recycled equipments with high degree of automation. 

Application: 

Suitable for residential sewage, office buildings, shopping malls, hotels, restaurants, institutions, schools, military and other domestic sewage and similar industrial organic

wastewater, such as textile, beer, paper, leather, food, machinery, breeding, slaughter, chemical, etc. Industrial organic wastewater treatment. 

 

Process description: 

The production wastewater passes through the mechanical grating machine (optional, the equipment is separately provided as needed) to remove larger floating matter and

suspended solids into the regulating tank, and the regulating tank pumps the primary sedimentation tank, and the primary sedimentation tank flows into the hydrolysis

acidification tank to make the macromolecule The organic matter is decomposed into small molecular organic matter, and the insoluble organic matter is converted into soluble

organic matter, and when entering the aerobic pool, the biodegradability of the sewage is improved, and the efficiency of oxygen is improved. 

The water in the acidification tank flows into the aerobic aeration tank, and the biochemical tank is provided with a hollow fiber filler, which has good elasticity and corrosion

resistance, and is suitable for the microbial hanging film. The biochemical pool can be equipped with a first-class biochemical pool, a secondary biochemical pool, and even a

multi-level biochemical pool. The water in the biochemical pool flows into the sedimentation tank with the honeycomb filler, and the special structure of the honeycomb filler

makes it a good sedimentation property. At this time, the sewage is separated from the sedimentation tank, and the effluent enters the clear water tank (if disinfection is required,

the user can disinfect the unit), the sludge enters the sludge tank, and a part of the sludge can be returned to the acidification tank as needed. The oxygen pool can also be

pumped out. Fans are generally outside the equipment. 


Our service:

Before sale.

(1)A year after a problem we can solve it at any time.

(2)If you need a replacement, we'll sell it to you at the cost price.

(3)There is any doubt about the equipment in the future, and you can contact us at any time

After  sale.

(1)A year after a problem we can solve it at any time.

(2)If you need a replacement, we'll sell it to you at the cost price.

(3)There is any doubt about the equipment in the future, and you can contact us at any time

 

FAQ:

(1)Are you factory or trading company? 

We are factory.

(2) What is your terms of payment?

T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.Or L/C.

(3) Do you test all your goods before delivery?How to install after the equipments arriving destination?

Yes, we have 100% test before delivery.We will provide detailed illustrations to you. If it is necessary,we will send technicians to help you.However,the visa fee,air tickets,accommodation,wages will be paid by buyers.Or you can ask your technicians to our factory,we will train him.

(4)Where is your factory located?How can I visited?

Our factory is located in Shandong Province,China.It is about 2 hours from Qingdao airport.We can pick you up if you need.Welcome to visit our factory.

(5)How long is your delivery time?

Our delivery time is true after the order is completed.

 

How to order:

(1)A detail inquiry to our Mail box.

(2)We can provied a technical guidance solution.

(3)We do the product after we receive 30% of the advance payment.During this period you can come and check.After the remaining tail payment is received, we will order the shipping.

Contact Us
Contact: Mobile: Address:
Ms Liu
Copyright © 2024 Shandong Jixu Environmental Engineering Co., Ltd.
All rights reserved.
Cloud computing support Feedback Manage