服务热线
0512-36900456
sludge dewatering plate and frame filter press machine for waste water treatment

Sludge dewatering plate and frame filter press machine for waste water treatment

 

1)  Pressurize the filter plate: Press the compression cylinder (or other  compression mechanism) to move the plate to the direction of the plate  and press the filter plate between

the two. The adjacent filter plates form a closed filter chamber.

2)  Pressure filtration process: The feed pump (diaphragm pump) transports  the slurry into the filter chamber. After filling, the pressure  filtration starts, and the solid-liquid

separation is performed by the  pressure of the pressure pump or the compressed air.

3) Loosen the filter plate: Use the pull-out device to pull the filter plate apart in the set mode and set order.

4)  Discharge of the filter plate: After the pull-out device successively  pulls the filter plate, the filter cake is detached by its own weight  and transported away by the lower conveyor.

Plate and frame water treatment machine sludge filter presser

Advantage

1) Automatic control and continuous working

2) Low energy cost and long service life

3) High dewatering efficiency and high solid containing rate of mud cake

4) Easy maintenance and management

5) Low noise and less chemicals6) Economical and reliable, wide application.


Our service:

Before sale.

(1)A year after a problem we can solve it at any time.

(2)If you need a replacement, we'll sell it to you at the cost price.

(3)There is any doubt about the equipment in the future, and you can contact us at any time

After  sale.

(1)A year after a problem we can solve it at any time.

(2)If you need a replacement, we'll sell it to you at the cost price.

(3)There is any doubt about the equipment in the future, and you can contact us at any time

 

FAQ:

(1)Are you factory or trading company? 

We are factory.

(2) What is your terms of payment?

T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.Or L/C.

(3) Do you test all your goods before delivery?How to install after the equipments arriving destination?

Yes, we have 100% test before delivery.We will provide detailed illustrations to you. If it is necessary,we will send technicians to help you.However,the visa fee,air

tickets,accommodation,wages will be paid by buyers.Or you can ask your technicians to our factory,we will train him.

(4)Where is your factory located?How can I visited?

Our factory is located in Shandong Province,China.It is about 2 hours from Qingdao airport.We can pick you up if you need.Welcome to visit our factory.

(5)How long is your delivery time?

Our delivery time is true after the order is completed.

 

How to order:

(1)A detail inquiry to our Mail box.

(2)We can provied a technical guidance solution.

(3)We do the product after we receive 30% of the advance payment.During this period you can come and check.After the remaining tail payment is received, we will order the

shipping.

 

 

Contact Us
Contact: Mobile: Address:
Ms Liu
Copyright © 2024 Shandong Jixu Environmental Engineering Co., Ltd.
All rights reserved.
Cloud computing support Feedback Manage